Hardisty South Terminal, AB, CA

Hardisty South is an expansion of, and co-located with, our existing Hardisty terminal, adding 112,500 barrels per day of takeaway capacity to the terminal by modifying the existing loading rack and building additional infrastructure and trackage. The Hardisty South terminal can load up to one and a half 120-railcar unit trains per day and consists of a fixed loading rack with 32 railcar loading positions. The strategic positioning of the terminal facilitated the growth necessary to service the high third-party demand for Canadian heavy oil egress, and will play a key role in growing the DRUbit™ platform.


Modes InboundPipeline
Modes OutboundRail
Railcar CapacityUp to 3.5 120-car unit trains (combined with Hardisty terminal) with 32 railcar loading positions
Servicing RailroadsCP
ProductCrude Oil, DRUbit™
Terminal Features
  • Unit train terminalling (up to 120 railcar trains)
  • Connectivity to Gibson Energy’s Hardisty storage terminal
  • Railcar fleet and freight services
  • Inventory management (Borque Data Systems®)
  • State of the art environmental controls including vapor recovery and thermal destruction
Location DetailsThe Hardisty South terminal is co-located with the Hardisty terminal; strategically located near the Hardisty crude oil storage hub
Have QUESTIONS? LET’S TALK. contact us